Location: Bunnerong Gymnasium Matraville Road, Bunnerong.

Business: A gymnasium

Task: Substantially improve air quality in the gym. 

The six IVR 760mm vents were allegedly having little impact on ventilation. Two were inoperative.

    HD TV

    Solution: Bradford Ventilation proposed the replacement of the 6 steel IVR vents with 7 aluminium Hurricane™ H700 Ventilators. 

    The Hurricane™ Ventilators exhaust considerably more air than the same sized heavier steel units.

    Result: Customer found that air in the gymnasium was considerably fresher due to the more efficient performance of the Hurricane™ ventilators. 

    This result is consistent with independent tests carried out by the University of Technology that showed a Hurricane™ H400 outperformed an IVR 400mm vent by 206% on flow coefficient.